Partapur Metro Station
In 2017, the Uttar Pradesh Metro Rail Corporation (UPMRC) initiated the project. Initially, the metro line was planned to have 11 stations, stretching from Partapur …
Partapur Meerut Metro Station in Meerut is designed with a distinctive layout, featuring two platforms and four railway tracks. Its structure is thoughtfully planned to allow the Meerut Metro to operate via the side platforms, while the Namo Bharat Train will run along the central tracks.
The station measures approximately 75 meters in length, 36 meters in width, and stands at a height of about 22 meters. It includes two entry and exit gates, currently under construction, and is equipped with modern amenities such as lifts and escalators for passenger convenience.
In 2017, the Uttar Pradesh Metro Rail Corporation (UPMRC) initiated the project. Initially, the metro line was planned to have 11 stations, stretching from Partapur …