Modipuram Metro Station
The first phase of the Meerut Metro covers a total length of 23.60 km (14.70 mi) from Meerut South to Modipuram. This phase consists of …
The first phase of the Meerut Metro covers a total length of 23.60 km (14.70 mi) from Meerut South to Modipuram. This phase consists of …
On March 8, 2019, Prime Minister Narendra Modi inaugurated the Meerut Metro project by laying the foundation stone, alongside the Delhi-Meerut RRTS project. Construction for …
The first trial run of the Meerut Metro took place between Meerut South Station and Meerut Central Station on January 12, 2025. As of today, …
The Meerut Metro is being developed in two phases, with the first phase currently under construction alongside the RRTS. Both phases are 38.60 km (24.0 …
Begumpul Meerut Metro Station spans approximately 246 meters in length and 24.5 meters in width, with a depth of about 22 meters. Despite its depth, …
Bhaisali Meerut Metro Station is an upcoming underground station located in Bhaisali, Meerut. Identified by station code A16, it is owned by the NCRTC. The …
The Meerut Metro Phase 1 has 13 stations on the route, Meerut Central Metro Station is one of them. The Metro of Meerut will run …
Brahmapuri station is the 5th of the 13 stations on the Meerut Metro line. Located on Delhi Road, right at the entrance of Transport Nagar, …
The Meerut Metro phase 1 project has a total of 13 stations. Out of these 13 stations, three stations are underground, one station is at …
The Meerut Metro Project has been under construction since 2019, when PM Modi laid down the foundation stone along with the RRTS project. Now both …