Shatabdi Nagar RRTS Station, designated with the station code A13, is an elevated station located in Sector 5, MDA, Meerut. It forms part of the Delhi-Meerut Namo Bharat Corridor operated by the NCRTC. The station offers seamless metro connectivity and is well-equipped with basic facilities like First Aid, washrooms, and drinking water. With a structural height of 15 meters, the station spans 215 meters in length and 30 meters in width..
It features two platforms, two entry-exit gates, and provides parking facilities. The next station towards Sarai Kale Khan is Meerut South, while Begumpul (under construction) lies in the direction of Modipuram. Although details about lifts, escalators, and the contact number are yet to be announced, Shatabdi Nagar Station is poised to be a key transit point in Meerut’s urban transportation network. Here are details for the Shatabdi Nagar RRTS Station Opening Date–
Shatabdi Nagar RRTS Station
| Particulars | Details |
|---|---|
| Station Name | Shatabdi Nagar Rapid Metro Station |
| Address | Shatabdi Nagar, Sector 5, MDA, Meerut |
| Station Code | A13 |
| Owned by | NCRTC |
| Opening Date | November 2025 (Expected) |
| Structure | Elevated |
| Next Station Towards Sarai Kale Khan | Meerut South |
| Next Station Towards Modipuram | Begumpul (Under Construction) |
| Metro Connectivity | Yes |
| Height | 15 Meter |
| Length | 215 Meter |
| Width | 30 Meter |
| Facilities | First Aid, Washroom, and Drinking Water |
| No. of Gates | 2 Entry-Exit Gates |
| No. of Platforms | 2 Platforms |
| No. of Lifts | – |
| No. of Escalators | – |
| Parking Facilities | Yes, Available |
| Shatabdi Nagar Station Phone No. | – |
Shatabdi Nagar RRTS Station Opening Date
Shatabdi Nagar Station will also serve as an interchange point between the Meerut Metro and the Namo Bharat Train. Once both services become operational at this station, passengers will be able to conveniently switch between the two networks, enhancing overall connectivity and travel convenience within the city.
Shatabdi Nagar RRTS Opening Date- The trial runs of both the Namo Bharat Train and the Meerut Metro have been underway for the past 5–6 months and have been completed. The power substation at Shatabdi Nagar became fully operational on 12th February, enabling seamless operation of both services in the Meerut section of the Delhi–Meerut Rapid Rail Corridor. Currently, the final approval from the Commissioner of Metro Rail Safety is awaited. The Shatabdi Nagar RRTS Station is expected to open for public use—serving both the Namo Bharat Train and Meerut Metro—in November 2025.
Once the Shatabdi Nagar Station becomes operational, it will greatly benefit commuters travelling towards Hapur via the Bijli Bamba bypass. Residents of nearby areas such as Brahmapuri, Rithani, Transport Nagar, Madhavpuram, Saraswati Lok, Metro Plaza, and others will gain convenient access to the Rapid Rail network, significantly improving connectivity and reducing travel time.
Related FAQs
-
When Will Shatabdi Nagar RRTS Start?
Shatabdi Nagar RRTS Station is expected to open in November 2025, after receiving final approval from the Commissioner of Metro Rail Safety. Trial runs of the Namo Bharat Train and Meerut Metro have already been completed.
Hey is there any official date or month confirm in which begumpul rrts will going to open
Metro job vacancy date confirm
.