Modinagar North to Modinagar South Rapid Metro Station
Two stations in Modinagar serve the area of town; the distance between the two is 3.9 km, which takes 4 Minutes to reach from one …
The Delhi Meerut RRTS project is an 82.15 km long semi-high-speed rail and regional transit corridor connecting the NCR (National Capital Region) cities of Delhi, Ghaziabad, and Meerut. It is the first and one of the four rapid rail corridors planned under the 1st phase of the RapidX project managed by the NCRTC.
The project begins at Jangpura and passes through Sarai Kale Khan, which serves as the terminal for all three planned corridors in Delhi, before ending in Modipuram, Meerut.
Two stations in Modinagar serve the area of town; the distance between the two is 3.9 km, which takes 4 Minutes to reach from one …
Along with Sahibabad, Ghaziabad, Guldhar, and Duhai Rapid Rail stations, there is another Rapid Train station in Ghaziabad District: Muradnagar Rapid Metro Station. The Muradnagar …
Guldhar Metro Station is an Elevated station that serves Raj Nagar, Raj Nagar Extension, Sanjay Nagar, and Guldhar Village of Ghaziabad. Along with Sahibabad and …
The location of Sahibabad Metro Station is Madan Mohan Malviya Marg, PIR Colony, Sahibabad Industrial Area Site 4, Vasundhara, Ghaziabad, Uttar Pradesh 201010, it is …
The Ghaziabad Rapid Rail Station is situated at Sector 7, Patel Nagar 2nd, Ghaziabad, Uttar Pradesh 201003, India. It is an elevated Rapid station, and …
From the Guldhar Rapid Rail station, the next station towards the Delhi route is Ghaziabad, which is 4.3 kilometers away. The rapid rail takes 3 …
There is only one station between the Guldhar and Sahibabad rapid metro stations. The total distance between the two stations is 9.3 Kilometers and it …
The Guldhar Rapid Metro Station is the 6th station on the operational route of the Delhi Meerut RRTS Corridor, and the Duhai Rapid Metro Station …
The Delhi Meerut Rapid X is designed to allow a maximum speed of 180 km/h (110mph), the distance between Meerut and Delhi will be covered …
On 5th January 2025, the corridor was extended to New Ashok Nagar from Meerut South, and after that, the operational length became 55 km. The …