Guldhar RRTS Station
Along with Sahibabad and Ghaziabad, Guldhar is the 3rd station in the city of Ghaziabad. The station code is A05, and the location of the …
Along with Sahibabad and Ghaziabad, Guldhar is the 3rd station in the city of Ghaziabad. The station code is A05, and the location of the …
Ghaziabad RRTS Station is the 5th operational station from the Delhi end on the Delhi Meerut RRTS Route; it is an elevated station. Ghaziabad RRTS …
The Sahibabad RRTS Station is the 4th operational station of the Delhi Meerut Rapid Rail Project; the station code is A03. The Sahibabad Rapid Station …
After the inauguration of the pending section of the Delhi–Meerut RRTS corridor on 22 February 2026, the operational stretch has been extended from Sarai Kale Khan in …
The Delhi–Meerut RRTS (Regional Rapid Transit System) is a semi-high-speed rail corridor connecting Delhi, Ghaziabad, and Meerut. The project spans 82.15 km and has been …
The foundation stone for the Delhi–Meerut Rapid Rail Project was laid by Hon’ble Prime Minister Narendra Modi in March 2019, with construction commencing in June 2019. Following phased openings, …
The Delhi-Meerut RRTS Corridor consists of 16 stations, starting from Jangpura and passing through Sarai Kale Khan. It then moves through Ghaziabad, Muradnagar, and Modinagar before crossing Meerut, running parallel to the Meerut Metro, and finally terminating at Modipuram.
The Delhi Meerut Rapid Rail project is owned by the National Capital Region Transport Corporation (NCRTC) and it is operated by DB RRTS Operation India …
The Meerut Metro project had been under planning since 2016, when Rail India Technical and Economic Services (RITES) prepared and submitted the Detailed Project Report …
In 2017, the Uttar Pradesh Metro Rail Corporation (UPMRC) initiated the project. Initially, the metro line was planned to have 11 stations, stretching from Partapur …