Sahibabad RRTS Station
The Sahibabad RRTS Station is the 4th operational station of the Delhi Meerut Rapid Rail Project; the station code is A03. The Sahibabad Rapid Station …
Metro Terms
The Sahibabad RRTS Station is the 4th operational station of the Delhi Meerut Rapid Rail Project; the station code is A03. The Sahibabad Rapid Station …
After the inauguration of the pending section of the Delhi–Meerut RRTS corridor on 22 February 2026, the operational stretch has been extended from Sarai Kale Khan in …
The Delhi–Meerut RRTS (Regional Rapid Transit System) is a semi-high-speed rail corridor connecting Delhi, Ghaziabad, and Meerut. The project spans 82.15 km and has been …
The foundation stone for the Delhi–Meerut Rapid Rail Project was laid by Hon’ble Prime Minister Narendra Modi in March 2019, with construction commencing in June 2019. Following phased openings, …
The Delhi-Meerut RRTS Corridor consists of 16 stations, starting from Jangpura and passing through Sarai Kale Khan. It then moves through Ghaziabad, Muradnagar, and Modinagar before crossing Meerut, running parallel to the Meerut Metro, and finally terminating at Modipuram.
The Meerut Metro project had been under planning since 2016, when Rail India Technical and Economic Services (RITES) prepared and submitted the Detailed Project Report …
In 2017, the Uttar Pradesh Metro Rail Corporation (UPMRC) initiated the project. Initially, the metro line was planned to have 11 stations, stretching from Partapur …
The Meerut Metro corridor is now operational between Meerut South and Modipuram, covering 12 stations. The final station, Modipuram Depot, is still under construction and …
Theoperational route of Meerut Metro spans 23.60 km, with 14.80 km elevated and 8.80 km underground sections. An added advantage of this route is that several stations are connected to …
The Meerut Metro project, initiated on March 8, 2019, by Prime Minister Narendra Modi, is an under-construction urban mass transport system in Uttar Pradesh, India. Managed by NCTRC and UPMRCL, it spans two phases: Phase 1 from Meerut South to Modipuram, and the proposed Phase 2 from Shradhapuri Phase II to Jagriti Vihar. Phase 1 covers 23.60 KM with 13 stations, while Phase 2 plans for 15 KM with 12 stations. Phase 2 is awaiting approval for a new detailed project report.