Namo Bharat Reach in one hour from Delhi to Meerut
The National Capital Regional Transport Corporation (NCRTC) has successfully conducted a full-length timetable trial run of the Namo Bharat trains from Sarai Kale Khan to …
The foundation stone for the Delhi Meerut Rapid Metro Project was laid by PM Narendra Modi Ji in March 2019 and construction of the same also began in June 2019.
The NCRTC named the provider of the services as RapidX and the trains are Namo Bharat, the fastest rapid transit trains in India, at an operational speed of 160 km/h (99mph), soon after the inauguration of the corridor.
The National Capital Regional Transport Corporation (NCRTC) has successfully conducted a full-length timetable trial run of the Namo Bharat trains from Sarai Kale Khan to …
On the occasion of World Environment Day, NCRTC has launched a special Electric Bike Taxi Service at the Meerut South Namo Bharat Station. This is …
The Modipuram Rapid Metro Station, designated with station code A21, is located along National Highway 58 in Modipuram, Meerut. This elevated station, owned by the …
Starting Friday, 23rd May 2025, NCRTC is returning its popular musical event, Namo Bharat Unplugged Live Musical Fridays. This is the second season, and it …
In a groundbreaking development, Namo Bharat—the semi-high-speed rail network connecting Delhi, Ghaziabad, and Meerut—will soon share its infrastructure with the upcoming Meerut Metro. This pioneering …
The Delhi–Meerut RRTS corridor consists of 16 stations and 2 depots, forming a high-speed regional transit link between Delhi and Meerut. Within Meerut, there are 4 RRTS stations and …
Taking a significant step toward improving the ease of living for residents of the National Capital Region, NCRTC has inaugurated a smart co-working space at …
Electric buses integrated with Namo Bharat stations boost last-mile connectivity, easing travel and promoting greener, faster public transport in Delhi-NCR
Taking a significant step towards operationalising the entire Delhi-Ghaziabad-Meerut Corridor, the National Capital Region Transport Corporation commenced trial runs up to Modipuram — the final …
The civil construction of the Foot Over Bridge (FOB) linking Sarai Kale Khan Namo Bharat Station with Hazrat Nizamuddin Railway Station has been completed. Spanning …